Slaughter Pen Phase 2 “Freeride Additions”

PTD has completed the layout and design of the entire trail system and approx. 40 technical trail features (TTF) aka freeride additions.  We have incorporated as many natural features as possible; multiple rock drops, rock gardens, down trees, steep bedrock faces, and tons of natural berms throughout the entire trail system.  Below are some shots of some of the natural and wooden features we plan to incorporate.  Slaughter Pen is going to be the sweetest trail system between the Appalachians and the Rockies.  It will set the standard for the new vision of an all inclusive bike park. ~Woody

phase-2-tornado-alley.jpg 

       Future 3 level log ride on Tornado Alley Trail.

phase-2-bluffline-drops.jpg

Rock Drops

phase-2-quarry-drops.jpg

Quarry Drops

Advertisements

~ by progressivetraildesign on February 16, 2008.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: